| Title of Document |
Language |
|
Final Report
|
|
SAM/IG/9 Report, presented by Secretariat
|
|
|
AC91-011 REVISED ON 31/07/12 - Addendum #1 - Advisory Circular 91-008: AIRCRAFT AND OPERATORS APPROVAL FOR RNP APPROACH (RNP APCH) OPERATIONS DOWN TO LNAV AND LNAV/VNAV MINIMA
Advisory Circular 91-011: AIRCRAFT AND OPERATORS APPROVAL FOR RNP APCH OPERATIONS DOWN TO LP AND LPV MINIMA USING GNSS AUGMENTED BY SBAS , presented by Secretariat
|
|
|
Information Paper
|
|
IP/01
|
SAM/IG/9 General Information, presented by Secretariat
|
|
|
IP/02
|
List of documents SAM/IG/9, presented by Secretariat (Revised)
|
|
|
IP/03
|
Agenda Item 8: Implementation of the new flight plan format
, presented by Panama
(Spanish only)
|
|
|
IP/04
|
Agenda Item 3: Implementation of performance-based navigation (PBN) in the SAM Region
Implementation of RNP arrival and departure procedures for the Tocumen Airport, presented by Panama
|
|
|
IP/05
|
Agenda Item 9: Aviation System Block Upgrade (ASBU). TECHNOLOGIES ASSOCIATED TO BLOCKS 0 AND 1 OF THE AVIATION SAFETY BLOCK UPGRADE (ASBU)
, presented by Thales
(English only)
|
|
|
IP/06
|
Agenda Item 6: Assessment of operational requirements in order to determine the implementation of
communications and surveillance (CNS) capabilities improvement for en-route and terminal area operations. GBAS implementation activities in Brazil and ionosphere analysis , presented by Brazil
(Spanish only)
|
|
|
IP/07
|
Agenda Item 6: Assessment of operational requirements in order to determine the
implementation of communications and surveillance (CNS) capabilities
improvement for en-route and terminal area operations. REGIONAL ATM COOPERATION: THE FABEC EXAMPLE, presented by SITA
(English only)
|
|
|
IP/08
|
Spanish only enviado por Bolivia
(Spanish only)
|
|
|
IP/09
|
Spanish only enviado por Bolivia
(Spanish only)
|
|
|
IP/10
|
Spanish only enviado por LAN Argentina
(Spanish only)
|
|
|
Others
|
|
Registration sheet, presented by Secretariat
|
|
|
Shows
|
|
Block 0:Capabilities within our Grasp , presented by IATA
(English only)
|
|
|
Preparations for AN-Conf/12 - ASBU Methodology, presented by Secretariat (Revised)
|
|
|
Developing Tomorrow’s Aviation System, presented by Secretariat
|
|
|
Aviation System Block Upgrades - Block 0, presented by Secretariat
(English only)
|
|
|
Industry Viewpoint – Block 0, presented by IATA
(English only)
|
|
|
Aviation System Block Upgrades -
Block 1, presented by Secretariat
(English only)
|
|
|
Aviation System Block Upgrades -
Blocks 2 & 3, presented by Secretariat
(English only)
|
|
|
Open discussion on regional
application of ASBUs, presented by Secretariat
(English only)
|
|
|
THALES PRESENTATION, presented by THALES
(English only)
|
|
|
Block 1 - An Industry Perspective, presented by Canso
(English only)
|
|
|
Working Paper
|
|
WP/00
|
SAM/IG/9 Template for working papers, presented by Secretariat
|
|
|
WP/01
|
SAM/IG/9 Agenda and Programme, presented by Secretariat
|
|
|
WP/02
|
Agenda Item 1: Follow up to conclusions and decisions adopted by SAM/IG meetings
REVIEW OF THE STATUS OF COMPLIANCE OF CONCLUSIONS FORMULATED BY SAM/IG MEETINGS AND PENDING ACTIVITIES
, presented by Secretariat
|
|
|
WP/03
|
Agenda Item 2: Optimization of the ATS routes, presented by Secretariat
|
|
|
|
Attachment 01 to WP/03, bil, presented by Secretariat
|
|
|
WP/04
|
Agenda Item 3:
Implementation of performance-based navigation (PBN) in the SAM Region
, presented by Secretariat
|
|
|
WP/05
|
Agenda Item 4: Standards and procedures for performance-based navigation operations approval, presented by Secretariat
|
|
|
WP/06
|
Agenda Item 5: Air Traffic Flow Management Implementation (ATFM) in the SAM Region
, presented by Secretariat
|
|
|
WP/07
|
Agenda Item 6: Assessment of operational requirements in order to determine the implementation of communications and surveillance (CNS) capabilities improvement for en-route and terminal area operations. FOLLOW UP TO THE IMPLEMENTATION OF THE NEW REGIONAL DIGITAL NETWORK REDDIG II
, presented by Secretariat
|
|
|
WP/08
|
Agenda Item 7: Operational implementation of new ATM automated systems and integration of the existing systems. FOLLOW-UP TO THE IMPLEMENTATION OF THE IMPROVE ATM SITUATIONAL AWARENESS PROJECT FOR THE SAM REGION , presented by Project Coordinator
|
|
|
WP/09
|
Agenda Item 8: Implementation of the new flight plan format
, presented by Secretariat
|
|
|
WP/10
|
Agenda Item 8: Implementation of the new flight plan format.
ACTIVITIES CONDUCTED BY BRAZIL FOR THE IMPLEMENTATION OF THE NEW
FLIGHT PLAN FORMAT, presented by Brazil
|
|
|
WP/11
|
Agenda Item 3: Performance Based Navigation Implementation (PBN) in the SAM Region
PBN implementation Brazil - RNAV5 routes and TMA procedures, presented by Coordinador del Proyecto Implantación Operacional PBN
(Spanish only)
|
|
|
WP/12
|
Agenda Item 5: Air Traffic Flow Management Implementation (ATFM) in the SAM Region
enviado por Secretaría
|
|
|
WP/13
|
Agenda Item 6: Assessment of operational requirements in order to determine the
implementation of communications and surveillance (CNS) capabilities
improvement for en-route and terminal area operations
ACTIVITIES PERFORMED UNDER THE SAM ATN ARCHITECTURE PROJECT, presented by SAM ATN Architecture Project Coordinator
|
|
|
WP/14
|
Agenda Item 10: Other business
Revision of Reports in the CARSAMMA PBN Data Base, presented by CARSAMMA
(Spanish only)
|
|
|
WP/15
|
Agenda Item 4:
Standards and procedures for performance-based navigation operations approval, presented by Colombia
|
|
|
WP/16
|
Agenda Item 6: Assessment of operational requirements in order to determine the
implementation of communications and surveillance (CNS) capabilities
improvement for en-route and terminal area operations
FOLLOW-UP TO THE IMPLEMENTATION OF A RAIM AVAILABILITY PREDICTION
SERVICE IN THE SAM REGION, presented by Secretariat
|
|
|
WP/17
|
Agenda Item 7: Operational implementation of new ATM automated systems and
integration of the existing systems
UPDATING TO THE GREPECAS C1 PROJECT ACTIVITIES - AUTOMATION, presented by Project C1 Coordinator
|
|
|
WP/18
|
Agenda Item 6: Assessment of operational requirements in order to determine the implementation of communications and surveillance (CNS) capabilities improvement for en-route and terminal area operations
FOLLOW-UP TO AMHS INTERCONNECTION IN THE SAM REGION
, presented by Secretariat
|
|
|
WP/19
|
Agenda Item 6: Assessment of operational requirements in order to determine the implementation of communications and surveillance (CNS) capabilities improvement for en-route and terminal area operations. GUIDE FOR GBAS IMPLEMENTATION ANALYSIS OF IONOSPHERE IMPACT ON GBAS, presented by Brazil
|
|
|
WP/20
|
Agenda Item 6: Assessment of operational requirements in order to determine the implementation of communications and surveillance (CNS) capabilities improvement for en-route and terminal area operations. FOLLOW-UP TO THE IMPLEMENTATION OF ATN GROUND-GROUND AND AIR-GROUND APPLICATIONS
, presented by Project Coordinator
|
|
|
WP/21
|
Spanish only enviado por Cmte Gabriel Rozzi- LAN Argentina
(Spanish only)
|
|
|
WP/22
|
Spanish only enviado por LAN Argentina
(Spanish only)
|
|